ns2018en:capacity_allocation [2017/12/21 20:35]
wesase [Tabell]
ns2018en:capacity_allocation [2017/12/21 20:37] (nåværende versjon)
wesase [4.3.1 Schedule for working timetable]
Linje 191: Linje 191:
 Main timetable change for national and international services – December 2018 Main timetable change for national and international services – December 2018
   
-**Timetable ​R19 is valid from 9.12.2018 to 14.12.2019.** +**Timetable ​R18 is valid from 10.12.2017 to 9.12.2018.** 
  
-Capacity is distributed for the entire timetable (R19). +Capacity is distributed for the entire timetable (R18). 
  
-Bane NOR must give its final response to the RUs' infrastructure capacity applications in the regular capacity allocation process for R19 by 21 September ​2018+Bane NOR must give its final response to the RUs' infrastructure capacity applications in the regular capacity allocation process for R18 by 22 September ​2017
  
 A detailed description of the planning process, including deadlines, will be announced in a separate letter to applicants. A detailed description of the planning process, including deadlines, will be announced in a separate letter to applicants.