Brukerverktøy

Nettstedverktøy


ns2020en:general_information

1. General information

1.1 Introduction

Bane NOR is the IM on the Norwegian rail network and has prepared and published Network Statement 2020, the 17th edition.

1.1.1 Bane NOR's organisation

 Bane NOR's organisation

Bane NOR is arranged into five divisions, each of which is responsible for its own areas, and four group staff teams with specialist responsibility across the divisions:

  • Development; Planning and implementation of projects linked with new infrastructure
  • Infrastructure; Administration, operation and maintenance, plus refurbishment of infrastructure
  • Customers and traffic; Traffic management, customer and traffic information, capacity allocation, operation and administration of traffic-related systems, contact with customers and contracts with railway undertakings
  • Property; Administration and development of property and hubs, plus operation and maintenance of stations, workshops and other service facilities.
  • Digitisation and technology; Development and deliveries in the fields of digitisation and technology to the entire company, plus introduction and use of modern, customer-friendly solutions for passengers and operators

The group staff teams bear overall responsibility for targets and strategies, frameworks and steering documents within their specialist fields across the divisions.

1.1.2 The railway sector in Norway

The railway sector in Norway

1.2 Objective

The objective of the Network Statement is to provide the RU and other applicants with necessary information on access to and use of the Norwegian rail network, as well as other railway-related services provided to the RU.

Directive 2012/34/EU has been implemented in Norwegian law by means of the Railway Regulations and the Licensing Regulations.

The Network Statement consists of a main document which describes the infrastructure in addition to the general conditions for operating services on the rail network. The Network Statement also includes annexes containing further detailed information.

The Network Statement also includes useful links to publications and other relevant websites.

The requirement for establishment of a Network Statement is stipulated in the Railway Regulations, § 5-1. More detailed requirements for the contents of the Network Statement are stipulated in the Railway Regulations, § 5-2.

Requirements concerning access to and use of the Norwegian rail network, including the IM's other railway-related services, are specified in the Railway Regulations.

Norwegian laws and regulations applicable to the railways are available on the NRA website at www.sjt.no Some of these laws and regulations have been translated into English. These translations are not official. Other Norwegian laws and regulations are available at www.lovdata.no

1.4.1 General remarks

As far as Norwegian legislation is concerned, the Network Statement is purely for information. This means that information in the Network Statement does not constitute legally binding obligations for Bane NOR.

When the ATS refers to specific sections in the Network Statement, this is not a legally binding obligation for Bane NOR unless the ATS specifically indicates that it is a legally binding obligation for Bane NOR.

The Network Statement is issued in two languages – Norwegian and English. Document content is the same in both languages. If there is any conflict between the Norwegian version and the English version, the Norwegian text takes precedence.

Reference is made in a number of sections to Norwegian legislation and traffic rules issued by Bane NOR. Parts of the legislation, as well as the traffic rules, are only available in Norwegian.

1.4.2 Liability

The information provided by Bane NOR in the Network Statement must be correct. Bane NOR nevertheless assumes no liability as a consequence of errors.

Any errors that may be detected during the period of validity of the Network Statement will be corrected and announced on the Bane NOR website as described in Ch. 1.6.2.

Bane NOR's objective is to provide services in compliance with the service description provided in the Network Statement.

The Network Statement may include information on planned changes during the period following the expiry of the document's validity period, cf. Ch. 1.6 below. Such information is not binding for Bane NOR.

The Network Statement refers to a certain extent to descriptions provided in other documents issued by Bane NOR. If Bane NOR is to make changes to documents which affect the rights or obligations of the RU, such changes must be sent to the RU for consultation before these changes are implemented.

1.4.3 Appeals procedure

The RU and any other applicants that feel they have been treated unfairly, subjected to discrimination or have otherwise had their interests violated in any other way may submit an appeal to the NRA in accordance with the Railway Regulations, § 11-2. This is particularly applicable to decisions made by the IM, the RU or the party running service facilities with regard to:

a) the draft and final version of the Network Statement
b) criteria established in the Network Statement
c) annual and operational capacity allocation
d) the charging scheme
e) the level or structure of infrastructure charges which the applicant must or may have to pay
f) schemes for access in accordance with the Railway Regulations, §§ 2-1, 2-5 and 2-6
g) access to services, collection of charges and payment for services in accordance with the Railway Regulations, § 12-2 and the Railway Regulations, Ch. 4
h) framework agreements concluded

Pursuant to the Railway Regulations, § 11-2 (2), the NRA must notify relevant parties of its decision on the matter within six weeks of having received all relevant information.

1.5 Structure of the Network Statement

RNE has compiled a common structure for the structure and content of Network Statement's (the Network Statement Common Structure). This Network Statement is compliant with RNE's Network Statement Common Structure.

The latest version of the Network Statement Common Structure is dated 6 March 2018 and can be found at www.rne.eu

1.6 Validity and updating process

1.6.1 Validity period

Network Statement 2020 is applicable to:

  • Access to and use of infrastructure, delimited by Timetable R20
  • Processing of capacity-demanding programmes for Timetable R20; this is also applicable if processing takes place before the start of Timetable R20

The Network Statement is published 12 months prior to the timetable period to which it applies and is valid for one timetable period.

Timetable R20 commences on Sunday, 15 December 2019 and ends on Saturday, 12 December 2020.

These dates have been established in accordance with the provisions of EU Directive 2012/34/EU .

1.6.2 Updating process

Bane NOR will use a supplement to Network Statement 2020 to announce any amendments or additions occurring after the publication of this Network Statement.

Amendment of a public regulation referred to in the Network Statement will only be announced by means of a supplement to the Network Statement if:

  • the amendment is not published in , and
  • The amendment may lead to restrictions in the use of railway infrastructure according to the basic service package, cf. the Railway Regulations, § 4-1 – cf. Ch. 6.1.1.

1.7 Publishing

Network Statement 2020 and annexes will be available in both hardcopy format and electronically on the Bane NOR website, where it can be downloaded for free. The Network Statement will always be available in two languages, both Norwegian and English. Document content is the same in both languages. If the two versions do not match, the Norwegian version will take precedence.

The Network Statement will be sent free of charge to RUs that have concluded ATSs with Bane NOR.

The annual publication of the Network Statement is announced in Norsk Lysningsblad and EU official journals.

1.8 Contacts

1.8.1 Bane NOR

Bane NOR can provide RUs with more detailed information on topics referred to in Network Statement 2020 upon request.

Bane NOR's contact address:

Bane NOR
Postal address Postbox 4350, N-2308 HAMAR
Office address Posthuset, Biskop Gunnerus’ gate 14, 0185 Oslo
Email postmottak@banenor.no
Internet www.banenor.no

1.8.2 OSS, Norway

Railway infrastructure administrators and railway capacity allocation authorities in EU member states have worked together to compile an OSS function that acts as a network of customer contact points within the scope of RNE. An RU can get in touch with an OSS with a view to applying for infrastructure capacity in an international rail network, and the OSS will then start the entire international coordination process.

The OSS will work on the basis of contact with an RU and after a meeting with the managers involved:

  1. Coordinate the handling of capacity-demanding applications for each requested international section within RNE in such a manner as to ensure that the applications are included correctly in the annual capacity allocation process.
  2. Oversee and safeguard the customer's optimum infrastructure capacity for the entire international infrastructure. Coordination of this process will mainly be carried out by means of simulation with RNE's PCS system.

Bane NOR's OSS:

Bane NOR
Postal address Postboks 4350, N-2308 HAMAR
Office address Posthuset, Biskop Gunnerus’ gate 14, 0185 Oslo
Email oss@banenor.no
Telephone 05280/+47 22 45 50 00

1.8.3 OSS, international

Link to international OSS: http://www.rne.eu/organisation/oss-c-oss/

1.9 Rail Freight corridors

Regulation 913/2010/EU concerning establishment of a European rail network for competitive freight came into force on 9 November 2010. This regulation requires the member states to establish international, market-oriented rail freight corridors in order to meet the following targets:

- to strengthen cooperation between infrastructure managers in important areas such as allocation of train paths, interoperability, interoperable systems and infrastructure development

- to find the right balance between freight and passenger services along the freight corridors, provide sufficient capacity for freight in compliance with market needs, and ensure that common punctuality targets for freight trains are met

- to promote intermodality between railways and other forms of transport by integrating terminals in the corridor management process

Bane NOR is participating in freight corridor 3; Scandinavian-Mediterranean Rail Freight Corridor – ScanMed RFCtogether with Banedanmark, DB Netz, RFI, the Swedish Transport Administration, ÖBB Infrastruktur and the Øresund Bridge.

Eleven international rail freight corridors (RFCs) have been established in the EU's rail network, see http://www.rne.eu/rfc-corridors

1.10 RailNetEurope – international cooperation between Infrastructure Managers

RailNetEurope (RNE) was created in January 2004 at the initiative of a number of European railway infrastructure managers that wished to establish a common European organisation in order to facilitate international services. To achieve this objective, RNE offers its members, railway undertakings, applicants and other stakeholders solutions and support with regard to compliance with the European legal framework. This involves developing and harmonising international railway processes, templates, handbooks and guidelines. It also involves developing the necessary IT tools that are streamlined and harmonised.

More information on RNE can be found at http://www.rne.eu/organisation/rne-approach-structure/

1.10.1 One Stop Shop (OSS)

One Stop Shop (OSS) is a network of contact points representing IMs operating international services. They constitute a single point of contact for railway services for the entire international route, from the first queries linked with access to the infrastructure to international queries and performance assessment following the running of a train.

Bane NOR's OSS oss@banenor.no

A list of OSS contacts in Europe is available at: http://www.rne.eu/organisation/oss-c-oss/

1.10.2 RNE IT tools

PCS
PCS is an international coordination system for searching for train paths for RUs and other applicants, IMs, allocation bodies and rail freight corridors (RFCs). The Internet-based application optimises coordination of international train paths by ensuring that queries and tenders are harmonised with all parties involved. PCS is the only tool for publishing allocated train paths and residual capacity, and for administering international track queries for the rail freight corridors (RFCs).

PCS can be accessed for free. If you would like a user account, please send your enquiry to RNE PCS Support: support.pcs@rne.eu.

More information can be found at http://pcs.rne.eu

CIS
CIS is an infrastructure charges information system for applicants, supplied by IMs and allocation bodies (ABs). This Internet-based application provides quick information and indications of costs related to the use of European railway infrastructure, as well as estimating the charges for using international train paths. CIS is an umbrella application for the various railway infrastructure charge systems.

CIS can be accessed for free and users do not need to register.

More information can be found at http://cis.rne.eu, or contact RNE CIS Support: support.cis@rne.eu.

TIS
TIS is a network-based program that supports international administration of railway traffic by supplying real-time data relating to international trains. Relevant data is obtained directly from Bane NOR systems. IMs send data to TIS, where all the information from the various IMs is collated and combined so that it is possible to track the running of a train from departure or the initial destination to the final destination. This permits transboundary monitoring of the train, from start to finish.

RUs and terminal operators are also able to access TIS. They are invited to participate in the RNE TIS Advisory Board: all members of this board are given full access to TIS data if they are involved in the same train running operation. If RUs and the terminal operators are not members of the RNE TIS Advisory Board, mutual agreements may be signed between the individual RUs and between the RUs and terminal operators.

TIS can be accessed for free. If you would like a user account, please send your enquiry to RNE TIS Support: support.tis@rne.eu.

More information can be found at http://tis.rne.eu

The RailNetEurope website includes information on the systems (tools) below:

Path Coordination System (PCS) PCS (formerly Pathfinder) is a system for application for and coordination of international train paths. http://pcs.rne.eu
Charging Information System (CIS) CIS (formerly EICIS) is a system for supplying price information in accordance with customers' needs. http://cis.rne.eu/
Train Information System (TIS) TIS (formerly Europtrails) is a system which provides real-time information on international trains http://tis.rne.eu/
ns2020en/general_information.txt · Sist endret: 2019/10/30 13:14 av wesase